• Tesoro - Refinery/Refining Engineering & Design
  • 3D Laser Drafted Plans - Refinery/Refining Engineering & Design
  • 3D Computer Drafted Plans - Refinery/Refining Engineering & Design
  • Refinery Pipeline Flow - Refinery/Refining Engineering & Design
  • Coker Tank Barn - Refinery/Refining Engineering & Design
  • 3D Computer Drafted Plans - Refinery/Refining Engineering & Design
  • Refinery/Refining Engineering & Design
  • Coker Tank Barn - Refinery/Refining Engineering & Design
  • Refinery/Refining Engineering & Design

Refining

Gekko has been working in refineries since the first day we opened our doors. Gekko personnel have worked in refineries filling roles such as Project Engineer, Project Manager, Operations Manager, Engineering Manager, and Technical Services Director. As such, we are familiar with the internal workings and project execution strategies employed by our customers. We understand the ever present need to perform quickly yet safely. We are familiar with the stages of project execution, the various refinery units and processes, and the overall business model associated with running a refinery. We strive to keep this in mind as we serve our customers.
Project Examples
  • Acid Plant Sewer Drain Replacement & Repairs
  • Acid Tank Foundation Modification
  • Addition of 12,000 Cubic Feet Per Minute (CFM) Blower
  • Air Compressor Plan Check
  • Air Quality Management District (AQMD) Variance Assistance
  • Alkylation Acid Analyzer Revamp
  • Alkylation Acid Gas Scrubber
  • Alkylation Caustic A/B Pump Replacement
  • Alkylation Contactor Vessel Post Weld Heat Treatment (PWHT) Stress Calculations
  • Alkylation Sponge Oil Reroute
  • Alkylation Storm Water Sluice Design
  • Alkylation Unit Propane Dehydration Optimization
  • American Petroleum Institute Recommended Practice (API RP) 752 Control Center Modifications
  • Amine Tank Vapor Containment
  • Ammonia Line Cost Estimate
  • Ammonia Tank Loading Area Evaluation
  • Analyzer Shelter System Analysis
  • Arc Flash Study
  • Area Drainage Sump
  • Barrel Containment Front End Loading (FEL) Design
  • BioDiesel B100 Additive Injection
  • Bleach Tank Foundation
  • Blower Exhaust Stack Design
  • Building Low Pressure Alarms
  • Bundle Cleaning Pad Design
  • Butane Loading Rack Debottlenecking
  • Bypass Duct Erection Plans
  • C5 Sphere Deluge Fire Water Modeling
  • Cable Oil Reservoir Pressure Safety Valves (PSVs)
  • Cable Tray Support Evaluation
  • CalARP Recommended Seismic Upgrades
  • CalARP Risk Management Plan (RMP) Tank Farm Piping Seismic Assessment
  • Carbon Monoxide (CO) Boiler Bypass Stack Evaluation and Remediation
  • Carbon Monoxide (CO) Catalyst Structure Analysis & Detailed Design
  • Change Room Blast Resistant Module (BRM) Installation
  • Cogeneration Facility Preliminary Design
  • Coke Barn Detailed Remediation
  • Coke Barn Inspection
  • Coke Barn Water Supply
  • Coke Cutting Deck Operator Shelter
  • Coker Blowdown Improvements
  • Coker Deck Replacement
  • Coker Egress Deluge
  • Coker Emergency Isolation Valve (EIV) Detailed Engineering
  • Coker Fall Protection Evaluation
  • Coker Fire Electrical & Instrumentation (E&I) Support
  • Coker Light Gas Oil (CLGO) Pump Replacement
  • Coker Platform Design
  • Coker Shelter Anchorage and Power
  • Coker Sluiceway Fall Protection Line Design
  • Coker Switch Deck Fall Protection Tie Point Design
  • Coker Top Head Handling
  • Coker Valve Condensate Drum Header
  • Coker Vapor Line Stress Analysis
  • Condensate to Sodium Hydroxide (NaOH) Diluent
  • Containment Certification
  • Continuous Emissions Monitoring Solutions (CEMS) Shelter Permitting Assistance
  • Control Building Blast Retrofit
  • Control Room Building Upgrade
  • Control Room Expansion
  • Control Room Hardening
  • Control Room Lift Station Evaluation
  • Cooling Tower Riser Supports
  • Cooling Water Backup Line for Air Compressors
  • Cooling Water Pump Upgrades
  • Crude Exchanger Bypasses
  • Crude Oil Pump Minimum Flow Bypass Evaluation
  • Crude Oil Sampler
  • Crude Preheat Initiative Work Scope Development
  • Damaged Pipe Rack Analysis & Repair Options
  • Data Center Backup Generator
  • Data Center Roof Heating, Ventilation, and Air Conditioning (HVAC) Installation
  • Deaerator Controls Installation
  • Delayed Coker Unit (DCU) Actuator Upgrade Support
  • Delayed Coker Unit (DCU) Flare Tie Installation
  • Delayed Coker Unit (DCU) Sewer & Fire Water Line Rerouting
  • Design Pedestal for Jib Crane
  • Diesel Lubricity Skid Installation
  • Disulfide Separator Vessel Replacement
  • Electrostatic Precipitator (ESP) Location Plan 3D Model
  • Electrostatic Precipitator (ESP) Stack Anchorage Comparison
  • Employee Emergency Alarm System Upgrade
  • Electrostatic Precipitator (ESP) Structure Design
  • Exchanger Rerates
  • Fan Rotor Shaft Replacement
  • Fire & Gas Detection System
  • Fire Detection System Update
  • Fire House Facility Siting
  • Fire System Scoping
  • Flare Flow Probes
  • Flare Header Replacement Project Cost Estimate
  • Flare Knock-Out (KO) Drum Piping Displacement
  • Flare Line Replacement
  • Flare Minimum Wall Thickness Evaluation
  • Flare Pocketing Removal
  • Fluid Catalytic Cracking (FCC) Deluge Riser Seismic Support
  • Fluid Catalytic Cracking (FCC) Expander Inlet Duct Support Evaluation
  • Fluid Catalytic Cracking (FCC) Flue Gas Ducting Stress Analysis
  • Fluid Catalytic Cracking (FCC) Slurry Pump Structure
  • Fluid Catalytic Cracking (FCC) Steam Piping Stress Analysis
  • Fluid Catalytic Cracking (FCC) Structure Analysis
  • Fluid Catalytic Cracking (FCC) Structure Fireproofing Inspection
  • Foundation Hydrotest Evaluation
  • Fuel Gas Line Water Draw Quill
  • Fuel Gas Piping Hydraulics
  • Fuel Gas Treater Vapor Recovery Line Stops
  • Gas Detector Instrument Engineering
  • Gas Turbine Valve Replacement
  • Generation Station Selective Catalytic Reduction (SCR) Installation
  • Generator Heat Recovery
  • Groundwater Recovery Well Enhancement
  • Heater Emergency Shut Down (ESD) & Pilot Gas Valve Installation
  • Heater Shell Structural Evaluation
  • Heater Tubes Fabrication & Installation Specifications
  • Heater Upgrade Project
  • Heating, Ventilation, and Air Conditioning (HVAC) Structural & Roof Repair
  • Heavy Naphtha Quench Hydraulic Study
  • High Pressure Natural Gas Line
  • Hydrogen Plant Upgrade Pressure Swing Adsorption (PSA) Control Valves/Skids
  • Inspection Isometric Positive Material Identification (PMI) Review
  • Inspection Isometric Development
  • Instrument Shelter Permitting Assistance
  • Lab Heating, Ventilation, and Air Conditioning (HVAC) Upgrade Modifications
  • Light Cycle Gas Oil (LCGO) Pipe-Around to Reboiler De-Ethanizer
  • Light Cycle Gas Oil (LCGO) Preheat Rerun Feed Modification
  • Liquefied Petroleum Gas (LPG) Bullets Redundant Level Installation
  • Liquefied Petroleum Gas (LPG) Rail Car Rack Fall Protection
  • Logistics Workstation Installation
  • Lube Oil Rack Structural Modifications
  • Lube Oil Skid Pipe Support Remediation
  • Methanol Tank Foundation
  • Monorail System for Bensat Pumps
  • Motor Replacement
  • New Control Room Authorization For Expenditures(AFE) Development
  • New Fire Engine Building Preliminary Investigation & Cost Estimate Development
  • New Flare System Installation Estimate Development
  • New Preheat Heat Exchanger Installation
  • New Tank Foundation & Containment Area Design
  • New Warning Siren Preliminary Investigation & Cost Development
  • Octane Engine Room Ventilation
  • Oil Boom Installation
  • Operating Area Lighting Evaluation
  • Operations Closed Circuit Television (CCTV) Installation
  • Pipe Rack Analysis
  • Pipeway Engineering Evaluation
  • Potable Water Utility Flow Diagrams
  • Potassium Hydroxide (KOH) Mixer Auger and Access Platform
  • Pressure Vessel Rerate
  • Pressure Safety Valve (PSV) Piping Modifications
  • Pump Vibration Investigation
  • Radio System Upgrade
  • Rail Car Containment
  • Rail Car Unloading Rack
  • Reactor Anchorage Remediation
  • Reactor Catalyst Bed Evaluation
  • Reactor Installation
  • Refinery Building Blast Upgrades
  • Refinery Coker Drill Stem Fall Arrest Design
  • Refinery Coker Quench Water Valve Upgrade
  • Refinery Firewater Debottlenecking
  • Refinery Firewater System Design
  • Refinery Motor Control Center (MCC) Replacement
  • Refinery Security Upgrades
  • Regenerator Standpipe Replacement Seismic Evaluation
  • Replaced Refinery Control Room & Electrical Room Heating, Ventilation, and Air Conditioning (HVAC)
  • Security Card Reader Install
  • Selective Catalytic Reduction (SCR) Conversion to Aqueous Ammonia
  • Selenium Filter Foundation Repair
  • Sludge Centrifuge Installation
  • Smoke Alarm Monitoring System
  • Southern California Edison (SCE) Rule 21 Application Assistance
  • Steam Turbine and Chiller Installation
  • Steel Dike Wall Evaluation
  • Storehouse Modernization
  • Storm Water Containment Berm
  • Storm Water Ditch Repair
  • Storm Water Reroute
  • Substation Expansion
  • Substation Transformer Replacement
  • Sulfur Pit Vapor Piping
  • Sulfuric Acid Tank Secondary Containment Scoping Study
  • Tail Gas Treatment Unit (TGTU) Pipe Support Structure Design
  • Tail Gas Treatment Unit (TGTU) Pumps Foundation Evaluation
  • Tank Dome Shell Seismic Calculations
  • Tank Fitness for Service
  • Tank Foam Injection
  • Tank Nozzle Reinforcement Specification
  • Tank Replacement Foundation Review
  • Temp Bridge Design
  • Temporary Blast Resistant Modules (BRMs)
  • Thermal Oxidizer Natural Gas Routing
  • Toptech Truck Rack Computer Engineering
  • Tower Steam Jacketing
  • Trailer Certificate of Occupancy
  • Truck Loading Rack Fall Protection
  • Turnaround Blast Resistant Modules (BRMs)
  • Underground Pipe Replacement
  • Underground Piping Sleeve Design
  • Vacuum Tower Bottoms Pump Upgrade
  • Vacuum Tower Structural Observations
  • Vapor Recovery Comp Installation
  • Vapor Recovery Upgrade
  • Vessel Installation Permit Assistance
  • Vessel Platform Load Capacity
  • Wastewater Plant Improvements
  • Water Well Installation
  • Wet Gas Scrubber and Clarifier Steel Support Structure Design